Our ENgagement process

In a nutshell…
We commit on the yield of hydrogeological resources that we have identified through our surveys. We require our prospects to drill at least one vertical exploratory well at the precise location that we specify.

The below diagram summarizes our engagement process.

Flow Chart of the process of commitment of ANGIOO

A version PDF of this flow chart is available to download (right click” then “to save the target” if the document does not appear in the browser).

Our pricing policy is clear and transparent.

Technology

  • Direct Detection
  • Indirect Detection
  • Interpreting the Results
  • Benefits

Angiogeology

  • Scientific Background
  • Hydrodynamical models
  • Breakthrough
  • Paradigm shift

Services

  • Hydromineral Prospection
  • Hydrothermal Prospection
  • Geothermal Prospection
  • Water Supply Prospection

Benefits

  • Optimizing the Drilling Location
  • Reliability of the Specification
  • Results-based Fee only
  • Fast and Accurate